← Back to ProjectsConcept
Project 003
Energy Systems — Irreversible Safety-by-Design Storage
Fixed Irreversible Condition
Once deployed, the system must remain non-catastrophic without safety-critical intervention.
Target Scale
Years30–100+ years
Generations1–3 generations
CapitalInfrastructure-grade locked capital
Reality Connection
What is fixed now
- Abandonment structurally disallowed.
- Passive safety dominates design.
- Geological custody assumptions fixed.
Evidence artifacts
- System concept note
- Failure mode elimination map
- Custody lifecycle plan
Phase gates
Concept
- Define forbidden outcomes.
- Map passive safety boundaries.
- Specify custody horizon.
Prototype
- Demonstrate bounded failure.
- Validate containment.
- Stress-test degradation.
Deployment
- Custody & decommission locked.
- Monitoring becomes confirmatory.
- Intergenerational accountability assigned.